GalwayBayFM

13 million euro upgrade of Athenry Sewerage Scheme completed

Share this article
13 million euro upgrade of Athenry Sewerage Scheme completed

The 13 million euro upgrade of Athenry Sewerage Scheme has been completed.

Uisce Eireann says the investment will reinforce and future-proof the town’s wastewater network for population expansion and economic growth.

The project involved extensive upgrades to the network infrastructure, reducing the risk of sewer flooding and addressing non-compliant sewer overflows into the River Clarin.

Cairde an Chláir, an association of local angling groups says the elimination of non-compliant sewer overflow into the Clarin will be beneficial to the long-term health of the river and its fish stocks.

Advertisement

The works have ensured that the treatment of wastewater is fully compliant with EU Directives and Wastewater Discharge License Emission Limit Values.

Galway Bay FM News provides trusted, comprehensive coverage and analysis of local, national, and international stories.

Tune in every hour, Monday to Friday, 7am to 6pm, with breakfast updates at 7:30 and 8:30.

Catch the multi-award-winning FYI Galway from 5pm for all your news and sport, along with traffic and business information.

Download the Galway Bay FM app to get the latest stories on the go and stay connected on Facebook, Instagram and X

Advertisement
95.8 MHz Galway City
95.8 MHz Clifden & West Connemara
97.4 MHz South Connemara & Aran Islands
96.8 MHz County Galway
97.4 MHz East Galway
97.2 MHz Gort Area

Copyright © 2025. Developed by Square1 and powered by PublisherPlus.com

Download the GBFM App
Advertisement