GalwayBayFM

Plans progress for second phase of Knocknacarra District Centre

Share this article
Plans progress for second phase of Knocknacarra District Centre

Galway Bay fm newsroom - There are plans to progress Phase 2 of Knocknacarra District Centre.

Targeted Investment Opportunities ICAV has applied for planning permission for the development of a mixed-use 2 storey building at Western Distributor Road.

Phase 2 of Gateway Retail Park would encompass 6 retail units, a creche with an outdoor play area, a café/restaurant, first floor gym and offices.

The plans also include a new east/west pedestrian link with 151 basement and surface car parking spaces and 116 cycle spaces at surface level.

Advertisement

Phase 2 would be located north of the existing Dunnes Stores and vehicle access would be from a new entrance from the internal access road at the northern boundary of the site.

Galway Bay FM News provides trusted, comprehensive coverage and analysis of local, national, and international stories.

Tune in every hour, Monday to Friday, 7am to 6pm, with breakfast updates at 7:30 and 8:30.

Catch the multi-award-winning FYI Galway from 5pm for all your news and sport, along with traffic and business information.

Download the Galway Bay FM app to get the latest stories on the go and stay connected on Facebook, Instagram and X

Advertisement
95.8 MHz Galway City
95.8 MHz Clifden & West Connemara
97.4 MHz South Connemara & Aran Islands
96.8 MHz County Galway
97.4 MHz East Galway
97.2 MHz Gort Area

Copyright © 2025. Developed by Square1 and powered by PublisherPlus.com

Download the GBFM App
Advertisement