GalwayBayFM

Design team to be appointed for 200 extra beds project at UHG before end of year

Share this article
Design team to be appointed for 200 extra beds project at UHG before end of year

A design team is to be appointed before the end of the year for works to create 200 extra beds at UHG.

A portion of the existing beds will be lost in the works, but two additional blocks will be constructed, with over 150 beds each.

This is one of the steps in the hospital’s Master Plan, which also includes a new A&E Department, Maternity Unit, Paediatric Unit, and Cancer Centre

Galway West Fianna Fáil TD John Connolly says it's hoped the plans for additional beds will progress quickly

Advertisement

 

View this post on Instagram

 

A post shared by Deputy John Connolly (@johnconnollytd)

Advertisement

 

Galway Bay FM News

Galway Bay FM News provides trusted, comprehensive coverage and analysis of local, national, and international stories.

Tune in every hour, Monday to Friday, 7am to 6pm, with breakfast updates at 7:30 and 8:30.

Catch the multi-award-winning FYI Galway from 5pm for all your news and sport, along with traffic and business information.

Download the Galway Bay FM app to get the latest stories on the go and stay connected on Facebook, Instagram and X

Advertisement